午夜一区二区国产好的精华液,吉尺明步照艳全集图,五月天丁香婷婷爱爱打野战,纯肉无遮挡H肉视频在线观看,国产成人精品热玖玖玖

Successful case

Tesco

Date: 2020-11-27

Jiashan Tesco green logistics center is the first regional green logistics center built according to Tesco international standards. Tesco jiashan green logistics center has adopted a series of advanced environmental protection and energy saving technologies, with an investment of over 20 million RMB in energy saving, which will further improve the environmental protection and energy saving standards of the retail industry. It is also an important milestone in the construction of tesco's distribution network.

Tesco jiashan green logistics center adopts energy-saving design, covering an area of 55,000 square meters and nearly 240,000 square meters, and applies a large number of green energy-saving technologies and equipment, including renewable energy.

The solution provided by Fastlink: HVLS  fans.


Company vision:

We are committed to becoming the first-class gateway intelligent solution provider in China.

Contact Us
Product information:
  • svg Sectional Door(PDF)
  • svg High Speed Door(PDF)
  • svg Dock Leveller(PDF)
  • svg Cold chain loading and unloading system solution(PDF)
  • svg HVLS Fan(PDF)
Media Center :
  • svg Fastlink Promotional Video
?